| |
Building Inspection |
Jim VanDenHeuvel - Zoning Administrator / Building Inspector
Phone: 869-3809
Email:
Jim@hobart-wi.org |
|
| Village of Hobart benchmark map and descriptions (.pdf file- 141KB) |
4.002 Building Permit Required
|
The Hobart Municipal Code requires that no person shall build or cause to be built any one or two-family dwelling or commercial building without first obtaining a state uniform building permit for such dwelling or structure. Such building permit shall be furnished by the village. A copy of such permit issued shall be filed with the Village Zoning Administrator.
Application for a building permit for a structure intended for human occupancy on lands not served by public sewer shall be approved only if said application is accompanied by a valid holding tank permit or a valid septic tank permit. Validity of holding tank permit or septic tank permit shall be based on state statutes or county ordinances where appropriate.
Application for a building permit for a structure intended for human occupancy or occupation on lands served by a public sewer shall be approved only if said application is accompanied by a permit indicating that interceptors serving said structure have been installed, tested, and approved, where said approval of interceptors is done by a licensed engineer designated by the town board. Where said structure is erected on platted lands, then a letter from a licensed engineer to the building inspector indicating installation, testing, and approval for those lots contained within the plat shall replace the permit for individual lots.
Application for a building permit for any structure intended for human occupancy or occupation shall require approval of the road offering access to said structure, whether said structure is erected on public roads or private roads. |
|
|